Concrete Patios & Pool Decks in Lexington, SC | Backyard Slabs & Cool Decks Built for Carolina Heat
Lexington Elite Concrete builds concrete patios and pool decks in Lexington, SC that stay comfortable underfoot even when July temperatures climb past 95 degrees. Whether it's a simple backyard patio or a full pool surround with cool deck coatings and poured coping, every project is planned around how your family actually uses the yard. Slabs for outdoor kitchens, fire pits and hot tubs are part of the lineup too.
Each slab is pitched slightly away from the house and the pool, so summer storms drain off instead of puddling. Coatings come from Sundek and SureCrete, two names trusted for heat-reflective and slip-resistant finishes. A standard broom-finished patio usually costs $7 to $12 per square foot and takes 2 to 4 days. A cool deck coating over an existing pool deck runs $4 to $7 per square foot and is wrapped up in 1 to 2 days.
The crew has finished more than 400 pool decks across Lexington County, Cayce and Irmo areas. Free estimates are delivered within 1 to 3 days. Payment stays flexible too, with 35 to 50% due to get started and the rest once the work is completed to your satisfaction.
Get a 100% Free Quote
Tell us about your project and we'll get book to you soon.
Why Choose Us for Concrete Patios & Pool Decks
A patio or pool deck should feel good under bare feet and hold up through years of cookouts, pool parties and summer storms. Every surface is planned with comfort, safety and easy upkeep in mind.
Cooler, Safer Surfaces Underfoot
On a sunny July afternoon, a cool deck coating can run around 20 degrees cooler than bare concrete, so nobody has to sprint from the pool to the lounge chairs. Every pool deck gets a knockdown or broom texture that keeps wet feet from sliding, even right at the water's edge. Joints are sealed flush with flexible sealant, which means no raised lips to stub a toe on. Families with young kids or older relatives appreciate that extra peace of mind. It's a big reason pool owners keep coming back when it's time to update the rest of the yard.


Layouts Built Around How You Live Outside
Before any concrete is ordered, the crew walks the yard with you and paints the patio footprint on the ground so you can picture where the grill, table and shade will go. A scaled drawing follows within 48 hours, giving you time to adjust sizes and shapes. About 1 in 3 patio projects now include a grill pad, fire pit area or hot tub slab poured at the same time, which saves a second visit and roughly 15% on the add-on. Conduit sleeves for lighting and gas lines are set before the pour, so nothing has to be cut out later.
Pool-Friendly Work From Start to Finish
Pools are covered and skimmers are protected during demolition, so dust and concrete chips stay out of the water. The deck is tied to the coping with a flexible mastic joint that keeps rainwater from sneaking behind the pool shell. Crews also coordinate with your pool service company, and most pool deck replacements wrap up in about a week, so the swim season isn't lost. Before leaving, the team rinses the deck and clears the site so the pool is ready to use as soon as the concrete cures.

Our Concrete Patios & Pool Deck Services
Lexington Elite Concrete handles every part of the backyard, from new patios and pool decks to cool deck coatings, poured coping, and slabs for outdoor kitchens, fire pits, and hot tubs. Each service below is built to handle Carolina heat, heavy summer rain, and years of family use.

Fresh Patio Pours and Full Replacements
We tear out cracked, sunken patios and haul the broken slab away before regrading the yard for proper drainage. Each new backyard concrete slab is pitched slightly away from the house so rain runs off instead of pooling by the door. We pour a 4,000 PSI mix reinforced with wire mesh and fibers, then add a broom finish for steady footing. Restaurants and cafes also count on us for durable outdoor dining patios.

Pool Decks Poured for Wet, Bare Feet
Cracked pool decks are broken out carefully so the pool shell and plumbing stay untouched. New decks include drains placed where water naturally collects, along with expansion joints that let the slab move through hot summers without cracking. A slip-resistant finish with H&C SharkGrip additive keeps swimmers steady, and a flexible mastic joint seals the deck to the coping. Apartment complexes, HOAs and community pools rely on the same approach for their commercial pool decks.

Heat-Reflective Coatings That Keep Decks Cool
We grind and clean the existing concrete first so the new coating bonds tightly instead of peeling a few summers later. An acrylic cement-based cool deck coating from Sundek is then sprayed on and troweled into a knockdown texture that grips wet feet. The light finish reflects sunlight on pool decks and patios alike. Faded or worn cool decks can also be recoated, restoring both the color and the heat protection.

Poured and Precast Coping for a Clean Pool Edge
Coping can be poured in place as a cantilevered edge that flows straight from the deck, or set as precast bullnose pieces on a level mortar bed. During coping replacement, the waterline tile is taped and protected so nothing chips or cracks. A smooth coping-to-deck transition keeps the edge comfortable to sit on. Our Lexington crew finishes every job with fresh mastic at the joint and a penetrating sealer that blocks pool chemicals and splash water.

Slabs for Outdoor Kitchens, Fire Pits and Hot Tubs
We pour level grill and outdoor kitchen slabs with gas and electrical conduit sleeves set in place before the concrete goes down. Hot tub pads are thickened and tied with a rebar grid to carry thousands of pounds of water without settling. Fire pit seating areas and pergola or gazebo pads round out the backyard. Every slab sits on a compacted gravel base, so it stays flat and solid for years.

More Room for Patios and Pool Decks
Cramped patios and narrow pool decks can be widened or extended to fit a full dining set, extra loungers or a shaded seating corner. Layout changes like rounded edges or reshaped corners help the space flow better with the yard. New concrete is tied into the existing slab with rebar dowels, and an isolation joint is added wherever it meets the house. Each extension is closely color-matched, so the added section blends right in.
Our Concrete Patio and Pool Deck Process

Backyard Walkthrough
Lexington Elite concrete crews start with a walk around your yard to note pool equipment, downspouts and where water drains after a storm. Our team measures the space and talks through finishes, coatings and any add-ons like a grill pad or hot tub slab.

Pool Protection and Tear-Out
Before demolition, we cover the pool and protect the skimmers, lights and waterline tile. Our crew then breaks out the old patio or deck and hauls every piece of debris off the property.

Base, Forms and Drains
We compact a fresh gravel base and set forms with a gentle pitch away from the house and pool. Deck drains, conduit sleeves and reinforcement go in next, so everything is locked in place before the pour.

Pour and Finish
Our Lexington crew pours early in the morning to stay ahead of the afternoon heat. The concrete is screeded, edged and given a broom or knockdown texture, and joints are cut to control cracking.

Coating, Sealing and Final Rinse
Once the slab cures, we apply the cool deck coating or a penetrating sealer and replace the mastic along the coping. We finish by rinsing the deck, clearing the site and walking the finished space with you.
Frequently Asked Questions About Concrete Patios and Pool Decks
Pool deck replacement usually runs $10 to $16 per square foot, including tear-out of the old deck. A standard 8 by 8 foot hot tub pad typically costs between $1,200 and $2,200.
Most cool deck coatings need a fresh topcoat every 5 to 7 years, depending on sun exposure and foot traffic. Rinsing the deck regularly and cleaning it with mild soap instead of harsh chemicals helps the finish last longer.
Lexington Elite Concrete finishes most pool deck replacements in 5 to 8 days. The deck can handle foot traffic about 48 hours after the final pour, and heavy furniture can go back on after a week.
Cool deck surfaces are coated with Sundek Classic Texture or SureCrete products, while sealed patios and decks get H&C SharkGrip additive for extra grip. Both options hold up well to pool chemicals and wet bare feet.
Bare concrete can get uncomfortably hot on a sunny afternoon, but a light-colored cool deck coating keeps the surface around 20 degrees cooler. Lexington Elite Concrete recommends pairing that coating with a lighter concrete shade for the most comfortable deck.
Make Your Backyard the Place Everyone Wants to Be
A cooler pool deck or a roomier patio can change how often your family actually uses the yard. Lexington Elite Concrete pours, coats and seals backyard surfaces that stay comfortable through the hottest months. Call today or request a free quote, and you'll get a detailed patio or pool deck estimate within 1 to 3 days.