Lexington Elite Concrete pours concrete slabs and foundations in Lexington, SC for homeowners, custom builders and business owners who need a level, load-ready base. Every foundation follows stamped engineering drawings and local code, helping the crew keep a 98% first-time inspection pass rate. Work ranges from monolithic house slabs and addition tie-ins to garage, shop and pole barn floors, plus footings, grade beams and equipment pads.
Excavation starts with a mini excavator and skid steer before a Wacker Neuson rammer and plate compactor firm up the subgrade. A Spectra Precision laser level keeps elevations accurate, and larger pours are placed by pump and finished with a ride-on power trowel.
A new home slab foundation typically costs $7 to $12 per square foot and takes 1 to 2 weeks, including inspections. A 24 by 30 foot shop or garage slab runs $5,500 to $9,000 and is poured within 4 to 6 days. Swansea and Batesburg-Leesville projects get the same free estimate within 1 to 3 days, with 35 to 50% due to start and the rest paid once the work is complete to your satisfaction.
Get a 100% Free Quote
Tell us about your project and we'll get book to you soon.
Why Choose Us for Concrete Slabs & Foundations
A foundation sets the tone for everything built on top of it, so there’s no room for shortcuts. Every slab is planned and poured with the framers, plumbers and inspectors who come next in mind.
Schedules That Keep the Whole Build Moving
Pour dates are locked in at least two weeks ahead and shared with your builder, framer and plumber, so nobody ends up waiting on concrete. About 9 out of 10 foundations are poured on the exact day promised, with rain days rescheduled within 48 hours. Plumbing rough-ins and sleeves are checked on-site before the pour to avoid costly cutting later. Whether it’s one home or a run of spec houses, the crew keeps pace with tight construction timelines. That reliability is a big reason local builders keep coming back job after job.


Flat, Square Slabs Framers Appreciate
Each slab is finished to within 1/4 inch of level over 10 feet, and diagonal measurements are kept within 1/2 inch so walls go up square. Anchor bolts and hold-downs are set with layout templates instead of guesswork, which means far less shimming and drilling for the framing crew. Every corner, step-down and garage drop is checked against the plans before the trucks leave. The result is a foundation that makes the next trade’s job easier and faster.
Moisture Protection Built In From the Start
Lexington’s humid summers and red clay soil can push moisture up through a slab, so every interior pour sits on a 15-mil Stego Wrap vapor barrier with taped seams and sealed penetrations. Termite pretreatment is coordinated before the pour to meet South Carolina building requirements. This added protection helps prevent warped hardwood, lifting tile and musty smells years down the road. Every foundation is also backed by a 10-year structural warranty for long-term peace of mind.

Our Concrete Slabs & Foundation Services
Lexington Elite Concrete pours foundations and slabs for everything from new homes and additions to shops, metal buildings, and backup generators. Each service below is built on properly compacted ground, solid reinforcement, and accurate elevations, so the structure above stays level for decades.

Slab-on-Grade Foundations for New Homes
A well-built slab-on-grade foundation gives a new home a solid, level start that resists settling for decades to come. We pour monolithic, thickened-edge and stem-wall-supported slabs over a carefully compacted subgrade and vapor barrier.
Plumbing sleeves and rough-in blockouts are set before the pour, so lines run exactly where the plans call for them. Each reinforced slab uses a 3,000 to 4,000 PSI structural mix sized to the home's design loads and soil conditions.

Addition Slabs That Tie Seamlessly Into Your Home
Home addition slabs extend the existing foundation for new bedrooms, sunrooms and expanded kitchens. Our Lexington crew extends the original footings first, then drills and epoxy-sets rebar dowels so the new slab locks firmly into the old one.
We make sure finished floor heights are matched carefully, so hardwood and tile flow from the original rooms into the addition without a bump. Any recesses for walk-in showers or step-down rooms are formed during the same pour.

Sturdy Floors for Garages, Shops and Pole Barns
Every garage, shop and pole barn slab starts with excavation and a crushed stone base compacted with a plate compactor. For post-frame buildings, we auger holes and pour concrete footings around each post before the floor goes in.
Forms are set with a laser level to pitch the floor toward floor or trench drains. After the pour, a ride-on power trowel compacts and polishes the surface into a dense finish built for vehicles and heavy tools.

Footings and Grade Beams That Carry the Load
Footings spread a building's weight into the soil, so we excavate to the depth on the plans and set formwork before the pour. Continuous strip footings support perimeter and load-bearing walls, while reinforced spread and column pad footings carry concentrated loads.
Grade beams are poured along the perimeter and beneath interior bearing walls to bridge weaker spots in the soil. Anchor bolts are set while the concrete is still wet, so the foundation is ready for framing.

Heavy-Duty Slabs for Metal and Commercial Buildings
We pour metal building, office and retail slab foundations with thickened column footings that line up with the steel frame's anchor bolt pattern. Heavy-duty shop floors use steel-fiber-reinforced concrete to resist cracking under forklifts and equipment.
Large pours are placed with a laser screed for a flat, consistent surface across the whole building. A dry-shake hardener is troweled in for added wear resistance, and construction joints are planned to keep each section tight and level.

Solid Pads for Generators, HVAC Units and Equipment
We pour generator, HVAC, pump and compressor pads sized to the manufacturer's footprint and clearance requirements. Each pad is reinforced with a rebar grid and thickened where heavier units sit, so it stays level under vibration and weight.
Anchor bolts are embedded during the pour and checked for level, making equipment setting quick and secure. Cracked or undersized pads can also be replaced or extended when generators or HVAC units are upgraded to larger models.

We start by reviewing your stamped plans and staking the building corners with batter boards and string lines. Our crew then excavates the footings to the required depth and removes any soft or organic soil. The subgrade is compacted and checked so the slab sits on firm, even ground. This stage usually takes 2 to 4 days, depending on the size of the footprint and site access.

Next, we set the forms and tie the rebar to the spacing and sizes shown on the plans. Our team lays the vapor barrier, seals every penetration and places plumbing sleeves where the rough-ins call for them. A county inspector then reviews everything before any concrete is ordered. Most homes and shops are ready for inspection within 2 to 3 days.

On pour day, we place the concrete by truck or pump and check elevations with a laser level as the slab takes shape. Our finishers bring the surface up with a power trowel and cut control joints within 24 hours. The slab is then kept moist while it cures and gains strength. Framing can usually begin about a week after the pour.
Frequently Asked Questions for Concrete Slabs and Foundations
Yes, the local red clay swells when wet and shrinks during dry spells, which can crack a slab built on poorly prepared ground. Lexington Elite Concrete removes soft soil, compacts the subgrade and adds a crushed stone base to keep the foundation stable through every season.
A home addition slab usually runs $8 to $14 per square foot, including footing extensions and rebar dowels into the existing foundation. A standard generator pad typically costs $400 to $900, depending on its size and thickness.
Foundations are built with Grade 60 rebar, Simpson Strong-Tie anchor bolts and hold-downs, and a 15-mil Stego Wrap vapor barrier under interior slabs. The concrete mix is matched to the structural plans, usually between 3,000 and 4,000 PSI.
Very little, as long as gutters and downspouts drain water at least 5 feet away and the soil slopes away from the house. Sealing any exposed slab edges and keeping plants and mulch below the slab line also helps keep moisture and termites out.
Lexington Elite Concrete typically clears a new slab for framing about 7 days after the pour. The concrete continues to gain strength for 28 days, so heavy equipment and stored materials should be kept off it as much as possible during that time.
Start Your Next Build on Solid Ground
Every strong home, addition or shop begins with a slab that's poured right. Lexington Elite Concrete handles the excavation, reinforcement and finishing so your project stays level and on schedule. Call today or request a free quote, and you'll have a detailed foundation estimate within 1 to 3 days.